Initial Consultation Document
The Initial Consultation Document (ICD) for the Yadkin-Pee Dee River Project is available in PDF format for viewing or downloading below.
- Download the ICD text (PDF, 5.71 MB)
- Download the Appendices (PDF, 6.23 MB)
Individual sections in PDF format for viewing/downloading:
Distribution Letter (PDF, 90.1 KB)
Executive Summary (PDF, 19.2 KB)
Table of Contents (PDF, 64.9 KB)
1.0 - Introduction (PDF, 37.6 KB)
2.0 - General Project Information (PDF, 770 KB)
3.0 - Project Operation (PDF, 363 KB)
4.1 - Project Setting (PDF, 448 KB)
4.2 - Hydrology and Water Use (PDF, 507 KB)
4.3 - Water Quality (PDF, 147 KB)
4.4 - Aquatic Resources (PDF, 243 KB)
4.5 - Botanical Resources (PDF, 154 KB)
4.6 - Wildlife Resources (PDF, 89.8 KB)
4.7 - Cultural Resources (PDF, 54.5 KB)
4.8 - Recreation Resources (PDF, 881 KB)
4.9 - Land Use and Aesthetic Resources (PDF, 203 KB)
5.0 - Relicensing Studies (PDF, 36.9 KB)
6.0 - Literature Cited (PDF, 68.8 KB)
Appendix A - Project Drawings (PDF, 126 KB)
Appendix B - Tillery and Blewett Falls Flow Duration Curves (PDF, 120 KB)
Appendix C - Emergency Drought Management Protocol (PDF, 199 KB)
Appendix D - Progress Energy Environmental Survey Methodology (PDF, 1.36 MB)
Appendix E - Progress Energy Water Quality Survey Data (PDF, 1.43 MB)
Appendix F - Progress Energy Aquatic Resources Survey Data (PDF, 0.99 MB)
Appendix G - Rare, Threatened and Endangered Species and Significant Natural Areas Maps (PDF, 848 KB)
