Choose State Change Location

Final Study Reports

Relicensing studies were conducted beginning in 2012 with the final study report filed with the Federal Energy Regulatory Commission (FERC) in January 2014. All study reports for the Keowee-Toxaway Project can also be accessed on the Project public relicensing website’s online library at www.duke-energy.com/lakes/keowee-toxaway-relicensing.asp.

Several of the relicensing study reports are undergoing updates and will be filed with the FERC with the Final License Application. These study reports include the following:

  • Keowee Reservoir Water Quality Model Study Report
  • Keowee Reservoir Water Quality Model Study Report Addendum – W2 Model Results Comparing Water Quality Predicted Under Duke Energy Trial Balloon (WQ3) and Revised (WQ4) Operational Conditions
  • Keowee Reservoir Water Quality Model Study Report Addendum – W2 Model Results from Climate Change Scenarios Using 1998 and 2008 Duke Energy Trial Balloon (WQ3) Conditions
  • Operations Model Verification Report
  • Operations Model Verification Report Addendum
  • Operations Model Study Report
  • Operations Model Study Report Addendum
  • Water Supply Study Report
  • Water Supply Study Addendum 1
  • Water Supply Study Addendum 2

 

Aquatic Resources

Cultural Resources

Recreation Resources

Shoreline Management

Water Quality

Water Quantity and Hydro Operations

Wildlife and Botanical Resources