Project Maps
Duke Energy is considering adding about 200 miles of transmission lines across 10 counties to maintain reliability and to move energy efficiently to customers throughout the region and state. The lines would be 230 and 500 kilovolts.
Map of proposed corridor and routes (pdf, 15.46 MB)
Hillsborough, Pinellas and Polk
- Kathleen Line information (pdf, 215 KB)
- Kathleen Line aerial map (pdf, 19.47 MB)
- Hillsborough aerial map (pdf, 19.34 MB)
- Pinellas aerial map (pdf, 17.1 MB)
- Polk aerial map (pdf, 17.19 MB)
Citrus, Hernando and Levy
- Levy Plant to Brooksville West Substation Line Information (pdf, 133.45 KB)
- Brooksville West aerial map (pdf, 19.27 MB)
- Citrus aerial map (pdf, 16.94 MB)
- Crystal River aerial map (pdf, 18.86 MB)
- Levy aerial map (pdf, 17.31 MB)
- Brookridge aerial map (pdf, 12.19 MB)
Lake, Marion and Sumter
- Sumter Line information (pdf, 92.2 KB)
- Sumter aerial map (pdf, 16.84 MB)
- Lake aerial map (pdf, 16.13 MB)
- Marion aerial map (pdf, 17.42 MB)

